My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
1020
>
1020 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 2:11:20 PM
Creation date
2/18/2017 2:11:07 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1020
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connecl side sewer per City Slandard #601. <br /> 5. Connect side sewer per City Slandard#'s 601, 602, 604. <br /> �6 Connect all rooftop downspouls to the side sewer. <br /> 7. Connect roo(top downspouts lo ihe drainage syslem provided (or this lot. <br /> 8. Rooflop runo(f must be discharged to a roof downspout infillration system per Cily of Everett Str�rm <br /> Manual 3-2.6.2. The approximale size trench is 3.5'wide, 2'deep and 25' long. See altachment tor <br /> more details. <br /> �) The contractor must meet wilh the Public Works Inspecfor to disr,uss potential drainage rouling prior to <br /> beginning lhe project. <br /> �� Install erosion conlrol measures as de'ermined by the Public Works inspec;or, such as sill lence, slra•;; <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion conlrol measures per Ciry of Everett Standards for small parcels <br /> ��i Remove erosion control measures upon completion of lhe projecl prior to final approval of the permit. <br /> 13. All excavated material from (oundation, sidewalk and driveways siiall be hauled fo an approved, <br /> permilled site. No waslinc� of malerial is allowed on this buildinn lot. <br /> ( 14 No dirl, mud, rocks or debris lo be Uacked onto roadway. <br /> 15. No building materials fo be stacked on sidewalks and sidetvalks to be hept clean and open for <br /> pedestrian travel. <br /> 1G. Adjust water meter box 1" above side��,alk qrade. <br /> 17. Remove and replace curb, guller and sidewalk as per City of Everett Standard Ptan #'s 305A R 306 on <br /> lhis proposal's(rontage as directed by lhe Public Works Inspector(i.e. al! unused driveways and any <br /> broken or damaged area must be replaced). <br /> 1£3. Install a Type I concrele driveway per City of Everetl Standard #307. <br /> -, ,8[1`"1 <br /> �19.- Pave driveway from lhe-#i�t property Iine out lo Q�e�eal paving. <br /> � <br /> 20. Contact lhe Waler Districl for connecting provisions for this building's vaater and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan #402 wilh a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump syslem is to be installed, lhe pressure line must discharge into a private manhole, then <br /> c�ravily flow across the public right-of-way. <br /> 23. A sprinkler systein is required for this buildinc� in compliance n�ith the requiremenls of NFDA�tandards <br /> 13D. <br /> ��Z <br /> �,;:_�»�,_;,�: <br />
The URL can be used to link to this page
Your browser does not support the video tag.