My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
1118
>
1118 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 2:25:10 PM
Creation date
2/18/2017 2:24:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1118
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
foundation 2�6 treated sill plate. <br /> "('russes will be buil[, in place, as per page 1-'�3 cro�s section lookim, <br /> Soutli, inset 8-1/6. Nail plated used as indicated. The ;outh end Truss will bc <br /> a double Truss with a gable support 2X12. And the Trus:,that ties the new <br /> construction to the old construction will be a single Truss with a gable supp���� <br /> of2X12. <br /> Roof sheeting(5/8 OSB)will be nailed in place. This will be covered <br /> with roofing felt and then 50 year Asphait shingles will be installed. <br /> Insutation will be R38 in the calline, R21 in the walls with R30 in thc <br /> Floors. <br /> Inlerior tinish will be 5/A inch sheeu'ock on the��alls. .And 1/2 inch for <br /> the ceiling. <br /> 4. We will follo�v the State.code, and have indicated tiic requircd Ie��els on pagc <br /> 2-5 Cross section "A", snd 3-5 Cross sections `;�". <br /> 5. Revised site plan is as indicated on page 1-5, Site Plan. <br /> G. See Structural Engineer changes. Page S I-0 Stiuctural Nc'�tes. <br /> 7. See page 2-5, and note addition of nail plates as sueuested by d Designer. <br /> C-oss Section"A". <br /> E, The wiudows installcd and to Ue installed mcet or cxceccl �l'SLC 300� Gd. <br /> See 2-5 First Ploor window and door schedule. <br /> 9. See the Kitchen Main Ploor Plan page 2-5. <br /> 10. Those that are to be replacements are; Page 2-5 and 3-5 iCitchen Main Floor <br /> Plan. <br /> Kitchen Sink <br /> Dishwasher hot water oniY <br /> Refrigerator cold water <br /> Those that will rcplace fixtures in the btisement are; Page 1-5 for basement. <br /> Sliower <br /> Wash Basin <br /> Commode <br /> Clothes�vasher <br /> I'o be new installation is; <br /> Vegetabfe sin}: (Kitchen Island) <br /> I 1. Finished elevations; sec paee 4-5. <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.