My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
1118
>
1118 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2017 2:25:10 PM
Creation date
2/18/2017 2:24:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1118
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. � � <br /> PUBLIC WORKS PERIVIIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. �� <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rookop downspouts to the drzinage system provided for this lot. � <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The apprcximate size trench is 3.5'wide, 2'deep and 25' long. See attachment for <br /> more details. <br /> � The contractor must meet with the Public Works Inspector to discu�s potential drainage routing pri�r to <br /> beginning lhe project. Call Rand Allen at 425-339-7403 //Call Cliff Lindman at 425339-7404. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fe��ce, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parceis <br /> 12. Remove erosion con6_'measures upon completion of the project prior to final approval of the permit. <br /> 13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of materiai is allowed c�:this building lot. <br /> 14. No dirt, mud, rocks or debris to be iracked onto roadway. <br /> 15. ' No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedestrian travel. <br /> 16. Adjust water meler box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Pian#'s 305A E 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type I concrete driveway per City of Everelt Standard#307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Pave to existing paving in aliey. <br /> 21. Contact the Wa!er District for connecting provisions for this building's water and <br /> sewer services. <br /> 22. A catch basin a� per City Standard Plan#402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, lhen <br /> gravity flow across the public right-of-way. <br /> 24. A s�rinkler syslem is required for this building in compliance with the requirements of NFPA Standards <br /> 13 D. <br /> PPlCommenls I Revised 618111 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.