Laserfiche WebLink
INSPECTION REPORT <br />Date: Permi <br />Contractor: <br />Site Address <br />%Owner: //ZA.Z� <br />4 �JI <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />❑ Temp Service <br />❑ UFER ground <br />❑ Groundwork/Slab <br />❑ Groundwork <br />❑ Fooling <br />❑ Rough In <br />❑ S!ab/Conduit <br />❑ Foundation <br />Ceiling Grid <br />❑ Rough In <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑itoortop Units <br />❑ Grounding <br />❑ Insulation <br />Final <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />V�YYr\„rechanical <br />❑ Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Roof Nailing <br />❑ Rough In/Service <br />❑ Footing drains <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Roof drains <br />❑ Building Final <br />❑ Gas Pipe Final <br />OTHER OR CONSULTATION:_ <br />PLUMBING <br />❑ Groundwork/Slab <br />❑ Rough In <br />❑ Ceiling Grid <br />❑ OK to insulate <br />❑ Water Service <br />edical Gas <br />oJoTNumbing Final <br />Hot Water Tank <br />❑ Rough In <br />❑ HWT Final <br />IY <br />AR�ROVAL FINAL APPROVAL THIS PER <br />OK FOR T.C.O. CORRECTII IN REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: — <br />Fl CALL (4251 257.8881 FOR REINSPECTION .24 hour notice required <br />Inspector: _ ` Date; <br />EIR (41091 �"-`"^ �' uuu. x rao+wnom • uc..0 mw <br />