Laserfiche WebLink
92-320 Parking Deck <br />Page 2 of 2 <br />The removal of the Tees should take place with two cranes to <br />prevent any type of shock that may cause the remaining structure to <br />collapse. The deck shall be compy vacated and closed off at <br />the time the Tees are being rec..,v <br />The lower part of the new wall should be constructed as a retaining <br />wall to facilitate the back'fill to floor level for early use by the <br />Elks' members. This will also reduce the shrinkage of the total <br />wall. <br />The Tees in the second bay shall be supported at approximately 10 <br />feet from the beams to allow safe working conditions in the <br />excavated area. <br />Details for shoring the existing deck shall be submitted by the <br />contractor prior to construction. <br />Finally, it is the undersigned's opinion that the deck has been <br />poorly constructed and maintained, and that the contractor cannot <br />be geld responsible for damage, that may happen in any kind of <br />modification to the existing structure. <br />Respectfully submitted, <br />STRUCTURAL DESIGN ASSOCIATES, INC. <br />by: <br />Kase Vanden Ende, P.E. <br />president <br />KVE/eve <br />S <br />