Laserfiche WebLink
Mike Shepard <br />From: Mollie Hughes <br />Sent: Thursday, April 04, 2002 3:28 PM <br />To: Mike Shepard <br />Subject: RE: South Precinct Sign <br />Yes, you certainly can proceed. Becky has signed it off and I have moved it on for the building dept. which will look ct it <br />tomorrow. We will need contract price and contractor info before we can actually issue though. <br />-----Original Message ----- <br />From: <br />Mike Shepard <br />Sent: <br />Thursday, April 04, 2002 3:03 PM <br />To: <br />Mollie Hughes <br />Cc: <br />Becky Fauver <br />Subject: <br />RE: South Precinct Sign <br />The project will be bid Small Works. I have not mailed out the bid package yet because I was waiting for the okie <br />dokie from Planning and Permitting to proceed. Can I proceed? <br />Mike Shepard <br />Facilities Dianager <br />(425) 257-8896 <br />mshepard&i.everettwa, us <br />--Original Message ---- <br />From: Mollie Hughes <br />Sent: Thursday, April 04, 2002 2:27 PM <br />To: Mike Shepard <br />Subject: South Precinct Sign <br />In order to continue with the application for the sign, I need to know the sign contractor (if applicable) and a <br />contract price of work. The cost of the permit is based on the contract price for time and materials for installing <br />the sign. <br />Mollie <br />