My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2823 HOYT AVE TRANSFER STATION 2018-01-02 MF Import
>
Address Records
>
HOYT AVE
>
2823
>
TRANSFER STATION
>
2823 HOYT AVE TRANSFER STATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 3:33:16 PM
Creation date
2/18/2017 5:20:41 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2823
Tenant Name
TRANSFER STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
480
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1"FJM <br />onrc <br />Ma.or Robert Sr._?crsc:c <br />Lacarence Erickson <br />February 2, 1971 <br />".� J <br />� �«' �fv ��T <br />��:o,ccr Inpsection Trip Pacific Prestress Ltd <br />CiTY OF EVG1[Tt, EYERETT. WASMIN6TON <br />We would like to thank the Council for granting the approval of our Inspection <br />T.rip to the Pacific Prestress Ltd. Plant in Richmond, B, C. Canada, manufactures <br />of the segments of the City's new Parking Garage. We were concerned with the in- <br />stalYation of the conduit and boxes iu�bedded in slabs, walls and coiumns; who <br />was making the Inspections if any, and the Code knowledge of the person doing <br />ehe actual work, We were introduced to the Design Engineer and Electrician and <br />cvere shown the portion of the work perfonned at the plant. We had the Electrician <br />give us a detailed step by step procedure of ehe work he pteformed to be sure he <br />was in no way violating the Code. We did find during our co�rversation that the <br />ligh[ standards on Che top aeck have �n aluminum 12 3nch square box at the base <br />[t�at is imbedded in the concrete. This is a violation of Section 300-5 of the <br />:Jational Electrical Cede. Two of these boxes have been installed. We requested <br />tliae the balance not be installed until thia could be re3olved with the Engineering <br />iirm. <br />We found the plant [o be clean, efficien[ly run operation. The Administration, <br />h:nginpering, and Laborera all appeared to be of top quality, We felt that we <br />.ir� fortunate to have the Company furnishing materials for the Parking Garage, <br />�1� r�re sure that they will willingly comply [o our requests, <br />`.-r.-t.�/„f y�� � fG1�J�.—s` <br />' r.ircnce T. Etickson <br />i.'PC: � b <br />1 R37R L C T; 04 S: .-, <br />� .. . . .. ��r� . .. . _. .. . .c . FQv <br />�. . � ".�O�P.'R^. <br />
The URL can be used to link to this page
Your browser does not support the video tag.