Laserfiche WebLink
�;�• . �' 9• 5Y�' Y� � <br />amer: Lhl�zzy �i4U3.FGFF _ Page � of � <br />Proje�t Address: 3zo/ "��/T ?�leDhone �Sz-7g5a <br />3201 HOYT REP,41R <br />1. ASDESTOS REMOVAL <br />REMOVE ASBESTOS INSULAl'ION FROM PIPES AND BOILER IN BASEMENT. <br />ASBESTUS WORK TO EE PERFORMEG BY WASHINGTON STATE CERTIFIED <br />ASBESTOS WORKERS AND DISPOSAL 1'0 BE PERFORMED I�J CCNFORMANCE <br />WITH ALL LAWS AFFECTING THE RF.MOVAL AND DISPOSAL OF THESE <br />f^ATERIALS. <br />'. DEMOUTION <br />REMOVE GARAGE AND CARPORT LOCP.TED ON THE EAST SIDE OF THE <br />BUILDING. REMOVE 2 CHIMNEYS ON THE SOUI H SIDE OF THE BUILDING. STRIP <br />INTEP,IOR OF THE 6UILDING DOWN TO THE STUDS. STRIP OFF EXISTING ROOF <br />SYSTEM. <br />3. ROOF <br />BUILD NEW ROOF SYSTEM UStNG 2"X 12" RAFTERS �a I e" 0.C. INSTALL 3-TAB <br />FIBERGLASS ROOF!NG OVER 1 S�' FELT OVER I/2" CDX PLYWOOD. <br />4. TT <br />INSTALL NEW 5" K-STYLE GiJTT�RS W/2"X3" DOWNSPOUTS. DOWNSPOUTS TO <br />GO INTO EXISTING DRAIN PIPES OR NEW SPLASHBLOCKS. <br />5. AMIN � <br />REFRAME INTERIOR AS NEEDED TO CONFORM TO PLAN. CLOSE IN ALL <br />WINDOWS ON SOUTH SIDE OF BUILDING. INSTALL SLEEPER FLOOR IN <br />EASEMENT USING PRESSURE TREATED 2"X4" 'S AND PRESSUFZE TREATED 3/4" <br />PLYWOOD. <br />6. PLUMBiNG <br />REPLUMB HOUSE VIASTE WITH NEW PVC PLASTIC BACK i0 MAIN STACK. <br />INSTALL NEW WATER METER. INSTALL NEW TYPE "M" WATERLINES, SIZED TO <br />CODE. INSTALL NEW MAIN LINE, SIZED TO CODE. CUT AND PATCH CONCRETE <br />IN BASEMENT AS NEEDED. INSTALL 7 HOT WATER TANKS, o DOUBLE <br />STAINLESS STEEL SINKS WITN DELTA SINGLE HANDLE FAUCETS, 6 <br />BATHROOMS WITH STEEL TUBS AND STEEL SINKS. BATH FAUCETS TO BE <br />MOEN SINGLE HANDLE FAUCETS. INSTALL WASHER HOOf<UP AND LAUNDRY <br />TRAY IN L.AUNDRY P.00M. INSTALL .3 HOSEBIBS. <br />U <br />