Laserfiche WebLink
InspectionTvpe Date Inspector Result Remarks <br />Counter Visit 9/25/09 JCH See altacned email <br />From: Jeff Heilman <br />Sent: Friday, September 25, 2009 11:20 AM <br />To: Tarrira Gregory <br />Cc: Jessie Patterson; Mollie Hughes; Ginny Boersema; Tony Lee; Ted Budden <br />Subject <br />The owners of 3219 Hoyt came in today, September 25, 2009, to discuss the requirements to obtain a <br />building permit. I told them that they need to 5ubmit plans that are of sufficient delail to illustrate the <br />scope of the work that they are proposing to do under this permit. We discussed plans, energy ccde, <br />stair requirements, laterel bracing, insutation and plumbing. I infor�ed them thai the plans are not <br />reviewed for the electrical permit. I suggested that they hire a professional designer to prepare the <br />plans. <br />Jeff Heilman <br />Development Technician <br />City of Everett <br />Engineering/ Public Services Division <br />3200 Cedar Street, Everett WA 982G1 <br />Phone 425-257-8976 <br />Fax 425-257-8857 <br />Record Selection: <br />(Full outer join <br />Permit.Main x <br />Permit.lnspections) <br />{Permit_Main.PERMIT_NO}like {?Permit Number} <br />S:'�fdP�icicod�Crystal\ComplaintParameterReporLrpt <br />3/23l2011 Page 2 of 2 i <br />