My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3802 HOYT AVE 2016-01-01 MF Import
>
Address Records
>
HOYT AVE
>
3802
>
3802 HOYT AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 10:55:56 PM
Creation date
2/18/2017 6:14:43 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3802
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date{s) of work: <br />Location of work: <br />EXCAVATION/Cl2ENCHING S.A�ETY CHECKLIST <br />--6� 9� <br />��� <br />� <br />Work order <br />Is a"Competent Person", as defined in WAC 296-155-650, in chazge ofjob'? <br />Has Dial-A-Dig been called? .................. <br />..... Yes'��'j-No � <br />...... Xes � No [�- <br />Dial-A-Dig number Date & Time Dial-A-Dig Done <br />Are U�affic control devices in place? ........................................................................................... Yes �No � <br />Is trench/evacuation on the toe of a hill, slope, or neaz a retaining wall? ................................... Yes � No � <br />(If yes, consult supervisor or engineer for recommendations.) <br />If trench/excavation is less than 4 feet deep aze sides stable? <br />(If not, then trenchlexcavation must be shored.) <br />If `renct, is more than 4 feet deep is shoring in use? ................................... � <br />Is shoring rated for dept;� of trench/excavation? ...........: .. .�j. :�. �7.. <br />Is tabt:lated data for the shoring on the job site? .......... ..................... <br />Are spoil piles and other material stored at lease 2 feet from the edge of che <br />trench/excavation? <br />Is water removed from the bottom of the trench/excavation? <br />Yes� No ❑ <br />........................... Yes � PJo � <br />Yes � No � <br />Yes � ?�Io � <br />........... Yes � No � <br />............ Yes �No � <br />Is a ladder availaUle for entry/exit from trench/excavation? ...................c....c... ......................... <br />Does it extend 3 feet above top of trench? ............................. ���i� .. i......................... <br />Isit secured at the top? .........................................................b:........................................ <br />Has it been inspected for defec[s/problems today? ......................................................... <br />Is there a means of communication with rescuers in the event of an accidendgroblem? <br />Yes � No � <br />Yes � No � <br />Yes � No � <br />Yes � No p <br />." i: �' ■ <br />• Are the open sides of the trench/excavation barricaded, or protected, to prevent falls? ............. Yes��No � <br />Is there is a possibility of hazazdous atmospheres in the trench/excavation? ............................. Yes � No'0 <br />(Such as from leaking gas mains, nearby industries, wo:k over landfills, or other situations.) <br />If yes, is a calibrated gas detector in use? .............................................................. .. Yes � No [j <br />If yes, is a means of retrievai available for workers in tlie trench/excavation? ..��... Yes � No � <br />Are all workers on site aware of safety requirements for workers in trenches/excavations? ..... Yes �- No � <br />�' � 7 <br />Signature of Crew Leader. �y�u�N.l�h� -%� �uli>1f)1�1� Bate: �;�-` 6" y S <br />ron.us unwic�;���nia�urvs> <br />
The URL can be used to link to this page
Your browser does not support the video tag.