Laserfiche WebLink
EQUIPMENT: <br />ID <br />MATERIAL: <br />ID <br />CAP044307447 <br />CEMEU0061438 <br />COUP42300247 <br />COUP46300047 <br />ELL044303447 <br />PIPE44304247 <br />Pi°E46304347 <br />PLUG44307747 <br />REDU44303847 <br />TEE046304047 <br />VJYE044303947 <br />P�1ISCELLANEOUS: <br />I� <br />Work Activity Work Order <br />Work Order lYumbcr 20040970 <br />DESCRIPTION <br />UF.SCRIPTION <br />CAP 6 GASKETED PVC SEWER <br />CEMENT 20 MINUTE SET 50 LB. BA <br />COUPLING 4 CONCRETE x 4 Cl/PLA <br />COUPLING 8 CONCRETE X 8 Cl/PLA <br />ELBOW 6 BELL X SPIGOT 45 DEG P <br />PIPE 6 PVC SEWER ASTMD-3034 80 <br />PIPE 8 PVC SEWER ASTAID-3034 80 <br />PLUG 6(PVC) SEWEt2 BELL END <br />REDUCER G SPiG01 X 4 BELL PVC <br />TEE 8 BEL.I X 8 BELL X 6 BELL P <br />WYE G BELL X 6 BELL X 6 BELL P <br />DESCRIPTION <br />Date Units <br />Sub Total <br />Date <br />12/13/2004 <br />12/13/2004 <br />12I13/2004 <br />12/13/2004 <br />12/13/2004 <br />12/13/2004 <br />12/13/2004 <br />12/13/2004 <br />i2/13/2004 <br />12/13/2004 <br />12/13l2004 <br />Units <br />tA0 <br />1 00 <br />1.00 <br />1.00 <br />2 00 <br />13.00 <br />3.00 <br />1.00 <br />i.00 <br />1.00 <br />2.00 <br />Sub Total <br />Dale Unils <br />Sub Total <br />Page � <br />r;i;t;izoa�s �:e.�, <br />Cost <br />Cost <br />33 72 <br />$1i Bq <br />53.02 <br />$8 01 <br />$11A8 <br />$21 02 <br />$7 90 <br />8223 <br />$6.12 <br />$14.87 <br />524.22 <br />5114A3 <br />Cusl <br />so.00 <br />RE�ORDS <br />JAN 212005 <br />