Laserfiche WebLink
CLOSED CM AORR ORDER3 REPOR�I• <br />Tn'tai Utility 9taintenan�e Management System <br />03/li3/1997 Pzge � <br />_____________________________'_____________________________=__________________"=_ <br />Date Range :O1/09/1989 - 03/1%/1997 <br />CM Work Order Range :iC01091070001 - 7401195770910Pattern :7101096740039 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />________________________________________________________ <br />________________________ <br />CM WURK ORDER ID: 7101096740039 (continued) <br />TEE046306147 TFE 8° ALL GP.SKEi (PVC; 02/26/1997 1 25.92 <br />WYE04d303947 WYE 6" ALL GASKETED 02/28/1997 1 10.48 <br />vehicles: <br />ID------- <br />V0010 <br />V2112 <br />V2225 <br />V22?0 <br />,. , <br />�:��1 <br />43507 <br />V3509 <br />V3603 <br />V64�1 <br />VJ0002 <br />VJ0004 <br />VJ0027 <br />Description <br />-- --------------------------- <br />'92 GMC S10 P�J <br />91 CHEV 1 TON <br />88 FOYD 8YD <br />91 FORD F800 DUh'P 5 YARD <br />80 CASE VIBROMP,X W25 ROLLER <br />88 LAYTON H500B PAVER <br />88 CASE BACKHOE 4X4 <br />91 JOHN DEERE BKFi LOADER <br />86 CASE BACHIiOE 780 <br />80 CASE FLATBED TRAILER <br />93 INTERNATIONAL 10 YD <br />'95 CHEV 1-TON <br />'96 FORD 5 YARD <br />Total Material Cost: <br />Hcurs_ <br />3.50 <br />1.00 <br />I.00 <br />4.00 <br />1.00 <br />1.00 <br />4.00 <br />1.00 <br />5.00 <br />1.00 <br />13.00 <br />8.00 <br />1.00 <br />Cost <br />18.90 <br />5.31 <br />15.36 <br />43.20 <br />19.72 <br />�.96 <br />147.60 <br />18.88 <br />198.00 <br />0.00 <br />278.20 <br />47.20 <br />14.75 <br />Total Vehicle Cost: 813.08 <br />Work Description: <br />-------------------------------------------- <br />------------------------------ <br />REPLACED 8' UF MAIN. MAIN IS 8'6" DEEP. STANDPIPE FOR CB IS 32' SOUTH OF <br />MANHOLE-H6 IN 44TH. TOP OF STANDPIPE IS 3'6" LEEP. <br />Total cost for work order 7101096740039: � 2376 03 <br />