Laserfiche WebLink
Date(s) of work: <br />Location of work: <br />EXCAVATION/TRENCHING SAFETY CHECKLIST <br />//; - �% 9 � Work order <br />� 4� t/- ,. �- <br />Is a"Competent Person", as defined in WAC 29b-155-650, in chazge of job?...... <br />Has Dial-A-Dig been called% ......................... <br />Dial-A-Dig number <br />Date & Time Dial-A-Dig <br />Are traffic control devices in place? ............... <br />Is irench/evacuation on the toe of a hill, slope, oc neaz a retaining wall? <br />(If yes, consult supervisor or engineer for recommendations.) <br />� <br />If trench/excavation is less than 4 feet deep aze sides stable? ........................... <br />(If not, dien trench/excavation must be shored.) <br />If trench is more than 4 feet deep is shoring in use? ............... <br />�— <br />Is shoring rated for depth of trench/excavation? .......................:..1....... <br />Is tabulated data for the shoring on the job site? .................:................ <br />Are spoil piles and other material stored at lease 2 feet from the edge of the <br />trench/excavation? <br />Yes �No � <br />Yes [j No �— <br />Yes �. No � <br />.... Yes � No � <br />Yes [� No � <br />............... Yes ❑ No � <br />..................... Yes � No Q <br />..................... Yes � No ❑ <br />........... Yes 0- No � <br />ls water removed from the bottom of the trench/excavation? ..................................................... Yes 0 No � <br />Is a ladder available for entry/exit from trench/excavation? ......................�I .... �....................... Yes � No � <br />Does it extend 3 feet above top of trench? ....................................:.....T�..................... Yes � No � <br />Is it secured at the to � ..................................... Yes ❑ No � <br />p . ............................................................... <br />Has it been inspected for defects/problems today? ......................................................... Yes � No � <br />Is there a means of communication with rescuers in the event of an accidendproblem? <br />Are the opzn sides of the trench/excavation barricaded, or protected, to prevent falls? <br />Yes �- No � <br />........ Yes 0 No [] <br />Is there is a possibility of hazazdous atmospheres in the trench/excavation? ............................. Yes � No Q <br />(Such as from leaking gas mains, nearby industries, work over landfills, or other situations.) <br />... ... . . .. .. . ...... �.. Yes No <br />If yes, is a calibrated gas detector in use? ................................ . . . . . . . . ��.. � ❑ ❑ <br />If yes, is a means of retrieval available for workers in the trench/excavation? � ....:........ Yes � No ❑ <br />Are all workers on site awaze of safety requir � ents for workers in trenches/excavations? <br />/ <br />Signature of Crew Leader: �'U �1v���• �'� � ;'�"'��"' "� <br />Date: ii:- - `'/— � >' <br />..... Yes 0. No ❑ <br />wa.vs 0000icr:�0.aiuuias) <br />