Laserfiche WebLink
3. On-site defention of storm wafer runoff wril be required, in accordance with <br />City standards. If the downstream combined storm/ssnitary sewer system <br />has the capacity to handle the additional runoff, paymant to City Drainsge <br />Fund #340 may be allowad in lieu of providing onsite detention. (SF_PA <br />Water Po!icy) <br />4. A mitigation agreement with the Everett School District is required prior to <br />Final SEPA Approval is issued. (SEPA Publrc Service Policy) <br />RESPON518LE OFFICIAL: Allen Giffen <br />T.'TLE: Director of P!ar,ning <br />And Commun�ty Development <br />ADDRESS: 2930 Wetmore Avenue, Suite 8A <br />Everett, WA 98201 <br />DATE: �/,�G.� Apri122, 2004 <br />S/GNATURE: !//r'`" <br />r� <br />You may appeal this determination by filin� an appeal on forms provided by the <br />Planning Department and a fee to the Planning/Cvmmunity Development Permit <br />Service Counter af 3200 Ceda. Street, 2"d Floor, no later than fourteen (14) days <br />from the date tFie MDNS becumes final (which is a(ter the fourteen (14) day <br />comment period. <br />Contact Don Wood to read or ask about the procedures for SEPA appeals. <br />NOTE: the applicant, or faifure to comply with the conditi�ns up.nn which <br />the Determination of Non-Significance is predicated may wifhdraw a DNS in <br />ihe event of significant changes in the proposal, disclosure of new <br />significant informaticn, misrepresentation. <br />