Laserfiche WebLink
Mountain View Warehousc <br /> Stormwa�er Site Plan <br /> Pavement and landscape runoi( will be trealed in a StormFilter water quality tank <br /> preceded by a Vortechs pretrea�ment vault prior lo discharging to the stormwater <br /> conveyance system in Industry Street. <br /> Roof runoff will be collected and conveyed direc(ly to the slormwater conveyance syslem <br /> in hidustry Streel. <br /> Minor grading is proposed to bring the site to its proposed (inal grade. A majorily of the <br /> grading will be cuts o( 1' along the front 75% of the site. The back 25% of the site will <br /> see cuts up to 8'. The necessity of having 8' culs are lhe result of the prior rough <br /> gradiny that crealed a man-made berrn at lhe back o((he lot. <br /> I <br /> � �'�-���'�' THE BLUELINE GROIJP P���� 2 <br />