My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 INDUSTRY ST AVIATION TECHNICAL SERVICES 2018-01-02 MF Import
>
Address Records
>
INDUSTRY ST
>
1122
>
AVIATION TECHNICAL SERVICES
>
1122 INDUSTRY ST AVIATION TECHNICAL SERVICES 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 7:32:44 AM
Creation date
2/19/2017 8:41:50 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1122
Tenant Name
AVIATION TECHNICAL SERVICES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A4ountain Jiew Warehouse <br /> Stormwater Site Plan <br /> V) Analysis and Design of Required Runoff Control BMPs <br /> Detention Facility <br /> The developed site is not required ro provide detention, as a regional detention facil�ty <br /> called the Mountain View Pond was construcled for the entire the Mountain V,or� <br /> Business Center. Re(er to lhe "CSR Associaled Boulevard Slonnwater Site Plan" <br /> prepared by Reid Middlelon, dated J�me 2001, in the Appendix. <br /> The regional detention facility was design assuming thal impervious cover would be <br /> placed over 90% o( the business park once developed. Developmenl of the Mount�:in <br /> View Warehouse site will include impervious cover on only 77_°0 0(the developed site. <br /> Water Quality Treatment <br /> Per the aforemenlioned reporl, "each oF the commercial parcels will provide lheir own <br /> on-site water quality treatmenL Therefore, the developed sile is required to provide a <br /> storrriwaler quality heatment syslem per the City of Everelt Stormvealer M1.4anagement <br /> Manual (January 1997). <br /> Pavement and landscape runoif will be treatzd in a StormFilter water quality tank <br /> preceded by a Vortechs pretreatm.;nt vauil prior to discharging to the stormwater <br /> conveyance system in Industry SUeeL (Roof runotf will be collected and conveyed <br /> directly to the slormwater conveyance systern in Industry Street.) These water quality <br /> facility are designed per the City oi Everelfs cunent design policies for use of Sh11 <br /> StormFilters for stormwater trealment. <br /> Specifications (or the SlormFilter tGnk and Vortechs va��ll have b�en provided oy <br /> Stormwaler 360 and are included in both Ihe Appendix af lhis report and on the <br /> construction drawings. The propesed StormFiller tank wiil be a T. " precast manhole <br /> with 6 cariridges, each capable of a 15 gpm iloa� rafe. The proposed Vort��chs vaull has <br /> a design flow rale of 10.9 gpm/s(. <br /> Stormwater Conveyance <br /> All pavement and new roo( runoff v�ill be collected in a proposed slormv;ater conveyanc� <br /> syslem ihat ties into an existiric slorm conveyance system located along the frontage o( <br /> the sile (Industry StreeO. <br /> � <br /> � 0�1-035 Tri� B�ueuNe GRoua PageG <br />
The URL can be used to link to this page
Your browser does not support the video tag.