My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 INDUSTRY ST AVIATION TECHNICAL SERVICES 2018-01-02 MF Import
>
Address Records
>
INDUSTRY ST
>
1122
>
AVIATION TECHNICAL SERVICES
>
1122 INDUSTRY ST AVIATION TECHNICAL SERVICES 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 7:32:44 AM
Creation date
2/19/2017 8:41:50 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1122
Tenant Name
AVIATION TECHNICAL SERVICES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> a <br /> !; Stonmvater collecred on the lots�vill be conac}ed to the storm"�ater infi]tra[ion/de[ention pond <br /> located at [he north cnd of the site. Stormwater from Associated�oulevard will 6c conveycd in <br /> a separate s}'stem to the proposed infiltration/detention pond. <br /> I � � Stormwatcr from thc FSA site �vithin the Glenu-ood Crcek basin wil] also be routed to the <br /> I '�I proposed infiltration/detention pond. Storm�eater from the FSA site is treated and detained to <br /> j) stream p:-otection standards prior to entering the proposed storm«�ater sys?em. <br /> I � 7chle 2- Sitc Bosin Conditions <br /> � }' Basin Bosin ID Pervious Area CN Impervious Aren CN Total Arco <br /> ` t� Candilion (AC) (ACl (A.C) <br /> � Forested Site 66.9 7G U.00 98 G6.9 <br /> � j Develo ed S:te 6.7 56 C-0.2 9S 669 <br /> � r� <br /> �'C/L. -�. ���1 <br /> I �� Precipitafion Data <br /> I .� The follo�aing indicates rainfall depths for the 6-month,2-year, and 100-year, 24-hour duration <br /> storms Gom [nc City of��•crett Stornnrater h9anngement hlan.taL• <br /> p Desien Storm Rainfall D:�th inchcsl <br /> �� 6-month, 24-hour 0.99 <br /> 2-ycar, 24-hour 1.55 <br /> � 10-ycar, 24-hour 2�� <br /> 100-year, 24-hour � 3.ti <br /> �I Flow Control System <br /> l, StormSHi:D hydrolo�ic modcl �ti�as uscd to dcsign the proposcd regional infiltration/dcten[ion <br /> pond. Procedures and design criteria specifed in the 1997 City of Lverett Stannrn(er <br /> I � Mmtagement binnrinl���erc followed for h}'drologic modcling. Descriptions of the stormwater <br /> system .nd details of tiie design analysis are provided belo���. <br /> Hydrologic model input and outpu[ (or the site under forested conditions (Subbasin "site ') and <br /> � undcr proposed dcvcloped conditions (SubUasin "SI'rG") arc listcd in Appendix B. Although thc <br /> site has been excavatcd under past mining activity, the arca was considered to be forestcd in <br /> ilmodeling thc hydroingy. The s�tc was modeled as IIydrologic Scil Group C. Forested arcas <br /> •� were 2ssigned a cun�e numbcr of 76. For deacloped conditions, la�idscaped and la�co area���cre <br /> assigned a curce number of RG. <br /> �1 <br /> �� Stornin•at�r frnm the dcvclopmcnt ��•ill hc man;�ged �ti'ith an infiltration/detention pond designcd <br /> to mect Stre.unbank rrosion Control slandards. A plan �'ic��' and details of the st�nmti•:iter sys!em <br /> ! �� <br /> .� CSRAisauoted6oulevvd Rerurlk�e2C-0I <br /> + Sla�wclttFte%m '�' � 'I � '� �.O <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.