|
� �
<br /> � �
<br /> �
<br /> ;2; �: �:r i�ien:e PH �2� b27-3;;2.,;
<br /> F k A N K_L_I N �,,,._r zL� �A;� k25 82�-62��
<br /> ENGINEERING ���.�„nd ��,�. 98033 ;;,3��f-,n���nen�.��r�
<br /> r.;-c�;,�..,r;�,l-o��;���irir:G
<br /> �`; G-i,-� �� � �r
<br /> ����,Sc za, 2oos
<br /> EIVV�LORE SUMMARY
<br /> RE: Eldorado Stone TI
<br /> Seaway Business Park, Bldg E
<br /> Everett, WA
<br /> F!�ated space applies to Office space.
<br /> Vertical Glazing (Exteriorl: U=0.55, SHGC=0.45. Unlabeled glazing - "i/2" space Air,
<br /> low-e10101, fixed, default. Ur certified tested assembly per NFRC.
<br /> Vertical Glazing (I*?Iitesl: U =0.90, SHGC=exempt. Unlabeled glazing — double panz,
<br /> any airspace, default. Or certified tested assembly per NFRC.
<br /> Doors (Opaque, Exteriorf: Uninsulated metal, U = 1.2, default.
<br /> Doors IOpaque, To Warehouse): Wood, U=0.50, default.
<br /> Other Roof: R-19 batt insulation in wood framing, 24" oc. U =0.048, default.
<br /> Other Roof (At First FIr1: R-79 batt insulation on vented T-bar ceiling. U =0.053,
<br /> calculated.
<br /> Wall Type 1 IOpaque, Exterior, Floor t� 9'-0" AFFI: Concrete, min. 6" thick, furred with
<br /> metai studs, 3-1/2", 24" oc with R-13 batt insulation, U=0.11, calculated.
<br /> Wali Type 2 (Upaque, Exterior, 9'-0" AFF to Structure Above): Concrete, min. 6" thick,
<br /> with R-21 batt insuiation stickpinned to concrete, U =0.049 calculated.
<br /> Wall Type 3 (Opaque, South Warehouse at Office 104 and at Second Flrl: Metal studs,
<br /> min. 3-1/2", 16" oc with R-13 batt insulation, U=0.13 default.
<br /> �
<br /> �� ��
<br />
|