My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST 2018-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
1500 INDUSTRY ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:14:09 AM
Creation date
2/19/2017 9:02:04 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Notes
BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
( 3.0 OFF-SITE ANALYSIS <br /> 1 <br /> Based on ropodraphic feawres surrounding the si1c, d�ere is no upstream basin conlributing runoff <br /> to the proposed Building H development. Hardeson Road exists along the westem (rontage ot the <br /> site, which has its own pipe conveyance and collection system. The existing dr,velopment to the <br /> south drains away (rom the site as well. The ultimate discharge point of runoff from this :ite is <br /> into the wet detention pond located on the southeast corner of Hardeson Road and <br /> Merrill Creek Parkway. This pond discharges to the north undemeath Merrill Creek Parkway, <br /> and ahnost immediately runoff enters Merrill and Ring Creek which flows in a northcrly direction <br /> and within a mile or two enters Puget Sound. The City of Everett is well aware of the <br /> downstream drainage course nraining from the subject property. <br /> � <br /> ioa�o.00z.aoc pv�n�y] � <br />
The URL can be used to link to this page
Your browser does not support the video tag.