My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST 2018-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
1500 INDUSTRY ST 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:14:09 AM
Creation date
2/19/2017 9:02:04 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Notes
BUILDING SHELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.1 ELECTRIC ENERGY <br /> G1.1 Threshuld <br /> The PUD No. 1 forccasts an adcquate supply of electricity for thc S W Everett Subarea. Special Property <br /> Use permits are required for aboveground utility fzcilities. Thcse reviews will address landscaping and <br /> screening, vicw and compatibility issues. <br /> 6.1.3 Mitigation Measures <br /> 1. All power lincs carrying a vultage of Iess than 15 hV must bc imdergrounded. (SEPA Land and <br /> Shoreline Use Policies) <br /> 2. When maintaining corridors for abovcground lines near environmentally sensitive arcas, to the extent <br /> ieasible, the PUD shall leave cut tree stumps as snags for wildlifc. "fhc corridors must be replanted <br /> with native specics that will not grow high enough to impact the lines. (SGPA Plant and Animal <br /> Policies) <br /> Section 7: ENVIRON�IEN7'AL HGALTH <br /> 7.1 NOISE <br /> 7.1.1 Tl�reshold <br /> All development in Evcrett must be in conformance with thc requirements of EMC 20.08, the Noisc <br /> Control Ordinance. Noise studies may be reyuired to detemiine if a proposal is in confomiance with thc <br /> ordinance. <br /> 7.1.3 Mitigation Mcasures <br /> None <br /> 7.2 TOXIC/IIAZARDOUS �IATGRIALS AND EXPLOSNES <br /> 7.2.3 ]1liiigation Measures <br /> Construction Phase <br /> 1. Constniction equipment and vchicics must b� mai ,uir�il ao they do not leak fuels or luhricants. <br /> Durir,g consWction, a staging arca must be spccif; �i iur all vehicle maintenance activitics. The <br /> staging area must bc located well away from al( drainagc �ourses. Where possible, all stornnvater <br /> from related maintenance areas must be directed to the sanitary sewer, rather ihan the stomiwater <br /> system. (SEPA Earih, Wate•. and Lnvironmentai Health Policies) <br /> Z. During constructi�n activities, all spiils of fucl and hazardous matcrials must be contained and <br /> rcmoved in such a manner as to prevent their entering the waters �nd soils of the State. Cleanup oC <br /> spills must takc preccdencc over othcr���ork on sitc. (SGPA Earth, Waler and Environmental Health <br /> Policics) <br /> ��z3 <br /> �— — <br />
The URL can be used to link to this page
Your browser does not support the video tag.