Laserfiche WebLink
OS/�6/20�4 11:00 4256816487 UNIllE�SAL MECHANICAL PAGE 0_, <br /> 06/04/2�04 02�20 20E-522-SG. B9GINEEiiS NJP.TFR`1EST PACE 02/�Z <br /> E!� � W FNGINicLRS NURTI[WP:S", INI:., F.S. <br /> $'I'HUVTi.IRi\I.E)IOIvkP;HS ��Cflfi9 Wl%IULAA'NA.bE.V,f.,SEATILr:.WAyy115;?�61$ZS•.756p pn%(2f6�y7j,-GfiUR <br /> i <br /> I <br /> � <br /> Augu'st 4, 2004 <br /> f'ANATTON� CONSTRUC I iON, INC. <br /> 6650 SW Radwootl Lanc, Suite 370 <br /> Portl�and, Oregon 97224 <br /> ATTN;Tyc�li Colton <br /> RC-: � Seaway Business i'erk Building H <br /> Tygl�: <br /> Thcre will ba a new 900 pnund maximum welght HVAC unit that will be installed <br /> on ttie northeast corner of the Statvay Business Park Building roof approxfmately at <br /> Grid� 2 and B. The existiny joists that the HVAC unit will bear on were originelly <br /> designed to carry an additional 500 pound load on any two of its tqp panel points. <br /> The Joists are adequate tn carry the new mechanicat unit loads. 8efora instaliation <br /> plca�e verify that there are nu other existing mechanical units bearing on these <br /> JOISL,. <br /> If you have ony �dditional questions, please cali, Thank you. <br /> Sinc�rely, <br /> ENG�NEERS NORTHWEST, IfJG., P.S. <br /> II� ��� . ,�`O WAS <br /> � <G. <br /> Joanne Bayuga �~r � i I <br /> Project Enyine�ar � � � <br /> � ''.,: . <br /> +�`�` <br /> � s'`�`i�� t'� i: <br /> S>�).vALtit; <br /> ,'r4 i <br /> � EXPIRES 7!?u� ;� � <br /> JB:I¢ <br /> ENW IO].Oi7U7a <br /> I <br />