My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1500 INDUSTRY ST LEADING EDGE GYMNASTICS 2016-01-01 MF Import
>
Address Records
>
INDUSTRY ST
>
1500
>
LEADING EDGE GYMNASTICS
>
1500 INDUSTRY ST LEADING EDGE GYMNASTICS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2017 9:05:06 AM
Creation date
2/19/2017 9:04:57 AM
Metadata
Fields
Template:
Address Document
Street Name
INDUSTRY ST
Street Number
1500
Tenant Name
LEADING EDGE GYMNASTICS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. <br /> WEST � ��— <br /> COAST fI f� rr . � <br /> STRUCTURAL��� LJ � r L �� <br /> J rl <br /> ENGINEERING,INC. <br /> 10924 Mukilteu SpaeCwaY�Suila A Muklltoo.WA98275 Phaie:(<25)�7�8998 Fa�c:(42513<7�8966 Email:emall@wcw.net NNJV�.WCSE.NET <br /> January 10, 2011 <br /> Lease Crutcher Lewis <br /> Subject: Leading Edge Gymnastics <br /> Tenant Improvament <br /> 1500 Industry St. <br /> Suite 300 <br /> Evarett,WA <br /> WCSE Project No:W322E <br /> Attention: Dai Gorman <br /> Project Manager <br /> Dear Mr. Gorman, <br /> This letter is a follow up to our conversations regarding the above referenced subject. It is our <br /> understanding that there are two items to address based on the most recent field inspection. The iirst is <br /> the adequacy oi the header installed under the existing floor joists and the second is ihe ledger connection <br /> to the tilt up panel and iedger to joist connection. <br /> For ihe header you installed a 5-1�8X�2 GLB 24FV4. The largest opening is 7'-0". The header picks up <br /> the upper floor joists. Atter review,the 5-1/8x12 GLB is adequate. No additional corrective measures are <br /> required. <br /> For the ledger you would like to use a 1-1/S"x 14 OSB rim. The new joists will be supported on the rim <br /> with Simpson top mount hangers ITS2.37/14 or equivalent. End reaction of new joist is 570 Ibs. Hanger <br /> design capacity is 1550 Ibs. Fasten the rim'•-^efh lace entaof wedge anchors12 nches`frlom tope nd ttom <br /> 1/2" into concrete spaced @ 3'-0"o/c:. Stagg p <br /> oi rim. <br />/ <br /> If there are any o;�estions regarding this, or if we may be of further assistance, please contact Ihis o ice. <br /> Sincerely, <br /> 01-10-11 <br /> S M`c�9�, <br /> ,�S � ,�wsx� � <br /> y A �4J.�� <br /> / <br /> Travis McCandless, PE � <br /> West Coast Structural Engineering inc. � <br /> R JR7996� � <br /> ftRET�` � <br /> ��NAL E� <br /> �- <br /> � . <br />
The URL can be used to link to this page
Your browser does not support the video tag.