Laserfiche WebLink
INDUSTRIAL TESTING, Ii�TC. P. o. soX i5oi <br /> 3418 �verett Avenuc <br /> E��erett, \Vasl�ington 98201 <br /> Telepl�one 20� . 259-0817 <br /> 22 Dece•mber 1970 <br /> hir. Frank T�7oltring, <br /> Building Inspector <br /> City of iverett <br /> City Hall <br /> Everett, Wsshington 98201 <br /> S4tject . Investig&tion of one-story buildir.g <br /> 2003 Jackson Street, Everett, Wash. <br /> Dear Mr. Tdoltrir.g: <br /> In order to obtain a satisfactory foundation, it is required that <br /> during construction, pourino and settin� of monolithic ioundation, <br /> all water percolating toward said foundation fror� above and below <br /> ground be diverted away to drainage ditch along �av�d Jackson <br /> Street and keAt free of said foundation. <br /> Also South side footin� and West side footing shouln Ue a mini�aum <br /> of 8�' thick, otherwise ;:oundation to adhere to Uniform Bu�ldin� <br /> Code. Further, all water-soil loose mixture be removed fron <br /> bottom of footinos before placing concrete. <br /> The bottoms o£ the footings are below organic material and into <br /> satisfactory bearin� material. All organic material has been re- <br /> moved below the area of the floor. <br /> Sincerely, <br /> �C.:1-C'ti� -�. �-E�ut,�.A... <br /> i�:esley � Ferris, P. E. <br /> INDUSTRIAL T�STING, INC. <br /> i�?D?/s,i i <br />