Laserfiche WebLink
. � <br /> PUBLIC WORKS PERMIT COM.MENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> �� Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage systeri provided for this lot. <br /> />is,�esv,,�,-, <br /> 'S. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Evei �tt <br /> Storm Manual 3-2.6.2. Width �3� , Depth �.5, Length r5' <br /> 10. The contractor must meet with the Public V�/orks Inspector to discuss potent?al drainsge <br /> routing prior to beginni;ig the project. <br /> 1. Instail erosion control measures as determined by the Public Works inspector, such as si;t <br /> ��fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per Ciry of Everett Standards for small parcels <br /> � <br /> �`13.Rem�ve erosion control measures upon completion of the project pr';r to final approval of the <br /> �J permit. <br /> /'14.`All excavated material from foundation, sidewalk and dri�deways shall be liauled to an <br /> ( approved, permitted site. No wasting of material is ailowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.�.. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type i concrete driveway per City of Everett Standard #307. <br /> �1� Pave driveway from the front property line out to the sireet paving. <br /> 18. Contact the Water District fcr connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan �410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then graviry flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with tha requirements of NFDP, <br /> Standards 13D. <br /> PIVCammenis <br /> Z/2 <br />