My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 KASCH PARK RD 2018-01-01 MF Import
>
Address Records
>
KASCH PARK RD
>
2300
>
2300 KASCH PARK RD 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 1:38:08 PM
Creation date
2/19/2017 10:37:32 AM
Metadata
Fields
Template:
Address Document
Street Name
KASCH PARK RD
Street Number
2300
Notes
INCLUDES PLAN SET FOR B0803-013
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
798
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{�r.inu:r, Chin & ��iayo, Inc ��� <br /> July 18, 198:3 <br /> � � � � o � � � <br /> City of Everett <br /> Public Norks Departrnent ��� 19 19A,i <br /> City Service Center �`"'�,.,,—•—.�... __ <br /> 3200 Cedar Street CPublic�� E�pRp�` <br /> Everett, Washingto�t 98201 Works <br /> ATTINI'ION: Dan Matthias • <br /> SUBJECT: Commmity Transit (C.T.) Bus Barn Project <br /> Utility Calculations <br /> Dear Dan: <br /> Attached are sto�m drain and water/sewer use calculatio�is for the proposed <br /> C.T. bus barn project. <br /> The drainage c�:lculations follow the City of Everett methods for determin- <br /> ing storm drainage rim-off and storage. A przliminary 24" by 36" site <br /> plan is also included for your reference. For our design the detention <br /> pon3 will also act as an oil/water separator. Since my iast discussion <br /> with you, we ;7ave determined that we can store the entire 25 year storm on <br /> top of the amotmt needed for oil/water separation. It is my imderstanding <br /> that this sheuld save C.T. regional detention charges. <br /> The expected water/sewer use for all Phase I buildings (except bus washer) <br /> is as £ollows: <br /> Peak Peak Peak Average Averag2 Average <br /> Inst. Hourly Daily Daily Monthly Voltme <br /> Flow Flow Flow Flow Flow Use/Month <br /> 75 gpm 49 gpm 32 gpm 13 gpm 8 gpm 28,000 c.f./month <br /> '1'he bus washer will be the mc.jor water user on s;ite. The washer is a <br /> recycle Lype which reuses its water to wash sub<_:equent buses. In this <br /> mcde, 25 gallons of make up water wi11 be requii•ed after each washing to <br /> replenish rster lost from carry off by the buses;. If the recycle system <br /> is down, the washer can also operate directly from the water supply <br /> system. In this mode it takes about 100 gallons to wa�h one bus with each <br /> bus taking about one minute to wash. This method would only be used in <br /> case of an anergency. <br /> r <br /> 1� � - � �� � , --�� . , �. �C' C. . �� �� ( ��+� 1- - ll�.. ��7 � <br /> .i <br /> _ � � l�� �)�02 <br /> l <br /> 1917 First Avenue,Seattle,Washingto�9610' 12061 427-5300 Teles 15?770 Y.Ch,1PF <br /> r �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.