Laserfiche WebLink
y W�i;�. <br /> / � <br /> .� ' � <br /> Gommunity Transit Centr�l Operating Base <br /> ��� Nr�� <br /> Probable Gost Estimate �� � w�J� <br /> _/ <br /> January, 7984 <br /> � Administration Building, Area - 4,320 S.F. <br /> Structure $ 42,700 <br /> p'alls, Doors � Finishes 68,140 <br /> Mech. Systems 45,000 <br /> Elect. Sp:tems 18,630 <br /> Contractor's OfiP 13,600 <br /> Subtotal $ 46.00/S.F. $ 206,070 <br /> Operations Building, Area - 5,760 S.F. <br /> � Structura $ 64,300 <br /> . h'alls, Doors 6 Finishes 124,000 <br /> Mech. Systems 83,000 <br /> Elect. Systems 22,120 <br /> Contractor's 0&P 20,540 <br /> Subtotal $ 54.50/S.F. $ 313,960 <br /> Mairitenance Building, Area - 26,600 S.F. <br /> Structura $ 644,000 <br /> =t Roofing, Doors fi Fini;hes 278,900 <br /> �' Ptech. Systems 569,000 <br /> Elect. Systems 152,800 <br /> ` Ptaint. Equipment 374,000 <br /> * Contractor�s 0&P 135,30U <br /> Subtotal $ 74.75/S.F. $ 2,154,000 <br /> Fuel Island/Canopy/Fare Vault, Area - 3,410 S.F. <br /> Bus Washer Relocation, Area - 2,625 S.F. <br /> Islands 6 Canopy $ 78,960 <br /> " k'asher Bldg. 124,390 <br /> Tankage 144,000 <br /> Relocate Vacuum � Washer 56,000 <br /> Pfech. Systems 53,000 <br /> Elect. Systems 13,340 <br /> " Contractor's O�P 33,580 <br /> Subtotal $ 503,270 <br /> This Page Subtotal $ 3,179,300 <br />