Laserfiche WebLink
McCANN CONSTRUCTION COMPANY, iNC. ���� <br /> � <br /> 950 ANDOVER PARK EAST TUKWILA,WASH�NGTON 98188 <br /> TEL.(206)575-4330 <br /> August 3, 1984 <br /> KRAMER� CHIN � MAYO, INC. <br /> 1917 First Ave. <br /> Seattle� WA 98101-1027 <br /> Atte�tion: Dorr Anderson, P.E. <br /> Manager, Transit/Tranaportation Group <br /> Reference: McCann Project 1894/Everett Traneiit <br /> Designated Surveyor end Testinn Laboratory <br /> Dear Sir: <br /> i � <br /> We intend to employ Weat Side Cescade Survey, 7823 - 159th Plece NE; ,��C� <br /> Redmond� WA 98052 to perfarm the requi.red work for loceting-roada� ��'' <br /> perking lote, and structures for the above referenced project. <br /> We intend to emplay fltta Raseneu f.ompeny! Ine� 6747 Empire Wey S. � <br /> ' � Seattle� WA 96180 for all required testing on the above referenced <br /> � I project. <br /> I <br /> Please indicate your approvil of the nbove named canpanies by signing <br /> and returning the attached copy of this correspondence where indicated <br /> below. <br /> ' I <br /> i <br /> ; Sincerely, <br /> McCANN CONSTRUCTION COMPANY, INC. <br /> � <br /> ; ��.�i��/.� <br /> � � R. L. Wooden APPROVED AND ACCEPTED: <br /> � Manager of Conatruction <br /> � Administret.ion gyj <br /> Dorr Mderaon, .E. <br /> u <br /> RLW:ced Title: - <br /> P.O.BCXBd31J�TLK1':ILABRANCH S=AT'iLE,WASHINGTON�9�i;� <br /> L�CenS�,No 22 i-0�.r,^,-,;;4-N^-'3)BNO <br />