Laserfiche WebLink
Communiq�Transit <br /> Phase II Master Plan Update <br /> Pre-app��cation swnma�y <br /> Z/6/92 <br /> Project summary for pre-application meetin� <br /> Background <br /> The Comim�niry Transit Operating Base Faciliry is located at 8905 Airport Road on a 20 <br /> acre site in Everett. CT is in the process of updating its o�iginal master plan and will be <br /> appiyine for an amendment[o its concomitant agreement with the city.The orieinal master <br /> plan containe two phases. Phase I was built and is cun�endy reflected in the attached <br /> existine conditions drawing. <br /> Phase I cun'endy accommodates the followine: <br /> Buildines: • <br /> Administration 8720 sf <br /> Operations 7280 sf <br /> Maintenance 40032 sf <br /> Total 56,032 sf <br /> Parking: <br /> Auto and Van I65 <br /> Bus 100 <br /> Other 17 (Maint., vanpool, etc.) <br /> Space Nceds Analysis <br /> Communiry Transit conducted a Space Needs analysis ro deterniine p�ojecred ��rowth prior <br /> to initiatin�: the pha,e lI master plan update. The study.completed in 1991, indicated the <br /> followmg projected ��rowth (total space required).This study was used as the basis for <br /> updatin�the phase II master plan: <br /> Buildings: <br /> Administration 23,300 sf <br /> Operations 10,300 sf <br /> Maintenance 151,200 sf <br /> Total 185,300 sf <br /> Parkine <br /> Auro uid Van 365 ��ehicle ta��-et <br /> �us "�00 vehicle tm��_et <br /> pa�_e l�� <br />