My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1332 KOSSUTH AVE 2016-01-01 MF Import
>
Address Records
>
KOSSUTH AVE
>
1332
>
1332 KOSSUTH AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2017 11:11:14 AM
Creation date
2/19/2017 11:11:08 AM
Metadata
Fields
Template:
Address Document
Street Name
KOSSUTH AVE
Street Number
1332
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERNIIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per Cily Stanr3:d #601. <br /> 6,�'� Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> ��.�c c(e,�, co-f�l, basir, <br /> (� Connect rooftop nspouts to the drainage sYstem provided for this lot. l r�=<. (,- h�� _i-;� �i� <br /> ��l�z O��!-(c� �r� o�ri^�r'z;l h��hE ���lj!�c LJO�KS jnl��C�fnlr. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trencli is 3.5' wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potentia� drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Puolic Works inspector, such as silt <br /> fence, straw bales, swales, or ero�ion blar�kets. <br /> � 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control measures upon completion of the project prior io final approval of the <br /> � <br /> permit. <br /> ( 14. i� All excavated material from foundation, sidewalk and driveways shall be ha�led to an <br /> �_ approved, permitted site. No wasting of material is allowed on this building Iot. <br /> 15. Remove and ieplace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all u�used <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pa�:e driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> ��:atei and sewer services. <br /> 19. A catcYi basin as per City Standard Plan #402 viith a gas trap per Standard Pian #4?0 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> i <br /> 21. A sprinkler system is requirei for this building in compliance with the requirements of Nf-'DA <br /> Standards 13D. <br /> Pl4CommenLS <br /> 2/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.