Laserfiche WebLink
3as installatian Peirrr '� �� <br /> Cify of Erereft DEPARTMENT OF PUBLIC WOnKS Inspection Divisian <br /> Date— —_ _ - _ <br /> Appliancez No. Address - <br /> Conversian Units QWnff <br /> to 400,000 BTUs <br /> Comacion Units <br /> ovcr 400,000 BTUs Mstaller__ � <br /> Cook:to�es City of Everett, by. <br /> Ronge ToDs—Ovens <br /> Furnaces to 400,000 eTus — I M P O R T A N't N O T I C E— <br /> F���oces ovc� 400,000 BTUs All work mus* conform to the provisions of tFie ordinances of t'ia City of <br /> SPacc H�are�:�0 70,000 BTUs Everett, Washington. It is the responsibility of the Permit Holder to see that <br /> City Inspection Division is notifi�d and the installation inspected before <br /> Space Heaters over 70,000 6TUs �OV2fin9. <br /> Re(rigemtors <br /> Wuter Fiw:crs Remarks and Corrections: ._ �� <br /> PiPing � — <br /> Pipe in ezcess of 60' <br /> Clo�hes Dryers Inspection —Date___-- Mspector_ — .__ — <br /> A�� Co�d�non�n9 Units I Call Back — Date_ — Inspector. . _ <br /> Final — Date— Inspector_-__—__. <br /> IThis Permit nust be posted on Job before Starting Installation. <br /> Pcrmit Fcc . . . S Permit <br />