My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3923 KROMER AVE 2016-01-01 MF Import
>
Address Records
>
KROMER AVE
>
3923
>
3923 KROMER AVE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2017 12:02:35 PM
Creation date
2/19/2017 12:02:30 PM
Metadata
Fields
Template:
Address Document
Street Name
KROMER AVE
Street Number
3923
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> PUBLIC WORKS I'ERMIT COMMENTS <br /> 4. As per Public Works approved pian dated <br /> 5. Connect side sewer per Ciry Standard #601. <br /> /6}i Connect side sewer per City Standard �'s 601, 602, 604. <br /> �/ <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Conneci rooftop downspouts tu the drainage system provided for this lot. <br /> 9. �RooKop rur.off must be discharged to a roof downspout infiltratign system per City of Everett <br /> �Storm Manual 3-2.6.2. Width �, Depth �_S;Length� �, e s <br /> 10. A catch basin as per City Standard Plan �402 with a gas trap per Standard Plan �410 is <br /> required for the parking area. <br /> 11. Remove and replace curb, gutter and sidewalk as per Ciry of Everett Standard Plan �'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 2 Install a Type I concrete driveway per City of Everett Standard 7307. <br /> �13. Pave driveway from the front property line out to the street paving. <br /> 14. Contact the �__ Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 15. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 16. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the praject. <br /> 17. A sprinkler system is required for this buiiding in compliance �vith the requirements of NFDA <br /> Standards 13D. <br /> i� ���LL G—;�C�v'.�.� � �-� �:� ��� �- 2� ��r r-o�.�,��n�,� <br /> �.: <br /> 5 � O��c'/��k , u�� �'z���z-, � r.�C� �' C H��-uL�.�� ic A-ti.� <br /> f}'�i�ZLL'c7� F�t�2�77:�T�� �i�� /�J �c .{-5,—c��vC� Cr1�1'��Zi.S'L <br /> � <br /> C �1 -�-�c.� �u�LL�/�L��J �C..0 � , <br /> =3 cr :�— � �"�C�/j��-� -ll—u--�-- <br /> PWCo'nmenf5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.