My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 LAKE HEIGHTS DR 2018-01-01 MF Import
>
Address Records
>
LAKE HEIGHTS DR
>
2015
>
2015 LAKE HEIGHTS DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 3:35:59 PM
Creation date
2/19/2017 12:19:08 PM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2015
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1.0 INTRODUCTION AND GENERAI-INFORMATION <br /> � Clare Bridge of Everett is a 3.9 acre parcel located on a portion �f Sectioi.i 29, Township 28 North, <br /> Range 5 East. W.M., Ciry of L:verett, Washingron. The site lies in the northeast quadrant of the <br /> intersection of 19th Avenue S.E. (SR 527)and Lake Heights Drive. The proposed facility will co;uist <br /> of one Multi-Care facility building and associated grading, drainage, water quality and utility <br /> improvements. <br /> 2.0 EXISTING CONDITIONS <br /> The site currently contains two abandoned single family residence houses and a shed which will be <br /> removed in the initial stage of the project. Most of the site contains light forestcd cover with trees and <br /> small underbcush. Slopes are generally east to west acrossthe parcei at grades ranging from 2°!o to 5°G. <br /> p small pottion of the northeast comer of the site drains north to the adjacent developed prop:rty. All <br /> ezisting drainage ultimately flows into Silver Lake which lies immediately opposite 19th Avenue S.£. <br /> to the west. <br /> 3.0 DFTENTIQN/WATER QUALITY <br /> Due to the prozimity of the proposed project to Silver I.ake,on-site detention will not be required. The <br /> Sih�er Lake basin standards for water quality require a wet pond in series with a bio-Sltration swale. <br /> Drainage from all pa��ed azeas on-site will be collected and conveyed in a tighdinz system to a bio- <br /> filtration swale lceated in the northeast quadrant of the parcel. Following bio-filtrat�on, runoff is <br /> conveyed to a combination wet tank and open water quality pond located in the southwest corner of the <br /> site. Following wet pond treatment sito drainage ezits the site in a tighdine system to the west and is <br /> � discharged inta tha eaisting storm system Iocated on the east side of 19th Avenue S.E. at the <br /> intersectionwith Lake Heights Drive. The ezisting system conv.ys mnoff approzimately 150 feet notth <br /> prior to crossing beneath 19th Avenue S.E. and discharging inro Silver Lake. <br /> Please fi:td all calculations associated uii:h the design of t.�e E�o-filtration swale and water quality wet <br /> pond in the following section of this report. <br /> ( <br /> 6352.002 KWUph <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.