My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 LAKE HEIGHTS DR 2018-01-01 MF Import
>
Address Records
>
LAKE HEIGHTS DR
>
2020
>
2020 LAKE HEIGHTS DR 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2018 8:05:28 AM
Creation date
2/19/2017 12:36:04 PM
Metadata
Fields
Template:
Address Document
Street Name
LAKE HEIGHTS DR
Street Number
2020
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
783
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H C) �� <br /> � r� '' <br /> m � x <br /> C H <br /> 9 H V� <br /> H �I-� � <br /> fC n <br /> H �1 <br /> � H � <br /> �' �' Silver Lake Apactments <br /> x O� SMA 2-86 <br /> �'� y b , Page -19- <br /> c �� <br /> � � g <br /> �" � 35. All utility systems must be installed ��ndecground to <br /> zr-i � setvice this ptoject. <br /> a ti Ei � --� <br /> r' H y "` ' " t�be �developed by tAe Applicant and <br /> 36_ A;Final Site Plan m�•s <br /> ��y submitted to the Pl'anning DeparEtaent' reflecting a11.��� �o_,s� <br /> requirements contained " in' this "'ShoreTine``•� Substantial <br /> � � t" Decelopment Permit. Thase final plans mu'st be reviewed <br /> zyai and apnroved by t!�e City prior to issuance of any <br /> '"� ���' permi.ts for this project. <br /> 37 _ That construction or substan ial peogcess .toHard <br /> construction of this .pcojectCovali'?'of ,.the:' =Permitwitand"C"� <br /> tMo-.;years :,;after finaI. :apP <br /> ,completed within . five ,:;,yea[c.-. `s� If the ptoject has not <br /> been completed in � this time span, the permit will be <br /> reviewed by the Planning Department which Will do one of <br /> the Eollowing: <br /> _ extend the permit for one year, �r <br /> _ terminate the perm:t <br /> Done and dated this 23rd day of June, 1986. <br /> i C'i <br /> ' , i ��.�,—�'r� /1j. l���sccs.�� <br /> ; � — <br /> ( '.��,' Ja�M. DciScoll <br /> I ~ The decision on this application has been made by the Hearing <br /> Examiner based on the authoritp gcanted in Ordinaniocedurg� is <br /> amended. Ic is final unless the following P " <br /> I � <br /> followed: <br /> 1. An agg�ieved parr.y has filed a written request for <br /> reconsideration to the Heacing Examiner within ten (10) <br /> wotkin9 dal�s of the Hearing Examinec ' s decision. It is <br /> �`�►� the discretiun of the Hearing Examiner to grant or deny <br /> reconsideration_ The final date for recons.'deration is <br /> July 8 , 1986_ <br /> � � working days after the Heacing <br /> �1w Z. Within ten (10) <br /> Examiner ' s action on the reealsiwithtlthe C tya9�Cle[ked <br /> party files a written app <br /> '�'�� ofxice. <br /> \, If appeal�d p[operly , t`�e matter �+ill be submitted to the <br /> Everett City Council foc Eucthec considecatinn. <br />
The URL can be used to link to this page
Your browser does not support the video tag.