Laserfiche WebLink
�� <br /> � � � <br /> m � x <br /> � �� <br /> 9 H (n <br /> � <br /> H H <br /> FC C] <br /> H 7.1 <br /> "��] H � ' <br /> VJ H <br /> x z � q, In lieu of providing on-site detention, a baffle type oi1/water � <br /> ti] O <br /> y ty separator, si.zed per D.Q.E. criteria, will be required. A a orm sewer <br /> p�1 HC outfall discharging to the lake, sized to handle a �eveloped 10-year <br /> H � o sCorm, will te required. Grass lined swales upstream of the storm <br /> H� c��, sewer outfall are recommended.and will probably Ue required by the <br /> yy�q Departmer.t of Game. A looped 8" water main from Bothell-Everett , <br /> t" H y Highway along Lake Heights Drive must be constructed thr'ough tt.e site. <br /> oy H Silver Lake Water District authorization will be required .`or any . <br /> � d � connections to the water �:�ins �n &�thell-Everett Highway or 120th <br /> �� � Place S.E. <br /> y p� 10. A me�hod must be established for oil collection for all the residents , <br /> to prevent oil being drained in the lake water. The meLhod for <br /> establishing the oil collection must b� agreed upon in writing and , <br /> filed as a covenant on the. deed of the subject property. This I <br /> =_greement must be reached ;rior to the issuance of any building , <br /> permits. The Applicant is siso to put a condi.tion in all leases that � <br /> no oil changes are allowed on-site. i <br /> �t. SpecLal charges for connection to sewer system in accordance with II <br /> Ordii�ance 9Bu-83 are applicable. The actual cost shall be romputed by <br /> the Building Division per the ordinance in effect at the time and I <br /> according to the information providPd on the approved plans on the date . <br /> of permit issuance. <br /> It� v' i'. A traffic study is presently being conducted by the City of Everett for � <br /> �� the Silver Lake area. Building permits shall be issued only when �1) . <br /> i � the Silver Lake Area Wide T_raffic Study is comp].eted; and (2) Applicant I <br /> Iagrees to comply with all the traffic improvements defined in and <br /> Q'�`+ � required by the Sil.ver Lake Area Wide Traffie Study. TraFfic <br /> � �+..o� improvements must be completed prior to the issuance of any building <br /> permits for construction or the ApplicanL must agree to comply with a11 <br /> I the traffic improvements defined in and required by the Silver Lake <br /> Area 67ide Traffic Study. If the Applicant opts for the agreement, a <br /> Id� performance bond mu��t be posted at the time of agreement. Failure to <br /> post said bond will void the permit. <br /> �'�'� 13. The improvements on the Bothell-Everett HighWay must be installed at a <br /> �.� � time that will coincior with other improvements in the area so as to <br /> form a smooth transiti�n t,o the existing street system. A performance <br /> guarantee shall be submitted to the Public Works Department for a <br /> period of time acceptable to thc City Traffic Engi�eer for said street <br /> ��._� improvements. The performance 6uarantee amount will include a traffic <br /> 'I signal at Lake 9eights Drive. <br /> �.. 1U. Appllcant shall dedicaY.e a right-of•-way as required by the Silver Lake <br /> I `�..R Area Wide Traffic Study with a maximum total width of 100 feet for the <br /> \, Botheli-Everett ilighway along the full frontage of the property if znd <br /> Nhen additional rigF.t-of-Nay is required for the widening of the <br /> existing roadway. <br /> 15. P?destrian improvements are required to Lake Heights Drive per Traffic <br /> En�ineer'y approval. <br />