Laserfiche WebLink
I 1 SEC'PIQN 2-03, ROADWAY EXCAVATION AND EMBANKMEWT <br /> � I 2 June 8, 1996 <br /> � 3 2-fi3.3(3) Excxvation B�lo�v Grade <br /> 4 "Rock Excsrvation" is inserted beiore the fii:st sentence in the first paragraph. <br /> � 5 <br /> 6 The following is inserted after the second p�sregraph: <br /> 7 <br /> 8 Subexcavation. At any time, the Enr�ineer may orcier excavation below <br /> ' 9 subgrade to remove soft and unccmpactibi, material. The replacement material <br /> 10 shall be free-draining and gianular, or other materials as detertnined by the <br /> 11 Engineer. <br /> 12 <br /> 13 2-03.5 Payment <br /> 14 The second paragraph is revised to read: <br /> 15 <br /> 16 When the Engineer orders excavation below subgrade, unif contract prir,es shall <br /> I 17 apply, unless the work and/or the equipment to perform the work differs <br /> 18 materialfy trom the excavation above subgrade, then payment will be in <br /> 19 accordance v�ith Section 1-04.4. <br /> I <br /> I <br /> I <br /> i <br /> � <br /> � <br /> , <br /> � <br /> ,I <br /> � <br /> ENGLISH AMENDMENTS DIVISION 2 03.AP2 <br /> JUNE 8, 1998 Page 1 <br /> ( <br />