Laserfiche WebLink
Q <br />� <br />[� <br />PUBLlC WORKS PERMIT COMiVIENTS <br />As per Public Works approved plan dated <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />a <br />8. Connect rooftop downspouts to the drainage system provided for this lof <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of cverett <br />Storm Manual 3-2.6.2. The approximate size irench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />The contractor must meet with the Public Works Inspector to discuss potentiai drainage <br />r�uting prior to beginning tha project. <br />Insiall erosion control measures as determined by the Public U��orl<s inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />Install erosion control measures per City of Everett Standards for small parcels <br />Remove erosion control measures upon completion of the project prior io final apprcval of !he <br />permit. <br />All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wastin5 of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of t:verett Standard Plan #'s 305A <br />& 3C6 on this proposal's irontage as directed by the Public Works Inspeclor (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. <br />17 <br />Install a Type I concrete driveway per City of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />1 S. Contact the b'Vater Uistrict for connecting provisions for this building's <br />water and sewer services. <br />19. <br />(20 <br />21 <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan'k10 is <br />required for the parking a!ea. <br />Ii a sewer pump system is to be installed, the pressure Iine must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />A sprinkler system is �quired fcr this building in compliance with the requirements of NFDA <br />Standards 13D. <br />PR'Commecis <br />�� �, <br />