Laserfiche WebLink
� <br />CLOSfiD CM SVORIC ORDERS REPORT TO POSTING�_^ <br />. Total Utility Maintenance Management System <br />10/30/1998 Page 1 <br />________________________________________________________________________________ <br />Date Range :06/'l4/1900 - 10/28/1998 <br />CM Work Order Range :08108CJ810001 - UT2883- - Pattern :7101196649845 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Procram ALL Function ALL Activity ALL <br />-----____________________________________________________________________________ <br />CM YTORK ORDER ID: 7101196649845 Title: SO .75 INCH 8108 LARIMER RD <br />Item ID: -- <br />Location ID: -- <br />Program 710 Function 119 Activity 664 <br />Date Completed: 10/08/1998 <br />Overall Craft: <br />Issued: OB/25/1998 <br />Our of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />Issued by: Asaigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Planned Hrs Actual Hrs Cost <br />----- ------ ------------------------------ ----------- ---------- ---------- <br />UL CSG CAVANAH, SHANE G. 0.00 4.00 60.96 <br />46ST TDE1 THOMPSON, DWAYNE E. 0.00 4.00 83.08 <br />Materiale: <br />rD <br />ADAP34C00547 <br />ADAP34145347 <br />BOX000065547 <br />CORP34001847 <br />COUP34003947 <br />ELL034104247 <br />METE36089447 <br />N/A <br />PIPE34060647 <br />SADD46018247 <br />SETT34033647 <br />Vehiclea: <br />ID <br />�/fi0003 <br />VJ0026 <br />Description <br />ADAPTER 3/4" MIP X INSTA-TITE� <br />ADAPTER 3/4"MIP X 1"IPS INSTA� <br />BOX METER CONC W/STEEL LID <br />CORP STOP 3/4" CCT X T.NSTA � <br />COUPLING 3/4" 1/4 BEND COPPERQ <br />ELL 3/4" 90 DEG STREET BRASS " <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />TRACE WIRE <br />PIPE :s/4" POLY I.P.S. <br />SERVICE SADDLE 8" W/3/4" CCT <br />SETTER COP 5/8" X 3/4" (H12") <br />Description <br />94 CAT BACKFIOE <br />'97 FORD 1 TON SVC TRUCK <br />Total Labor Cost: 144.04 <br />Date # Used Cost <br />-------- -------- ---------- <br />10/06/1998 1 8.48 <br />10/06/1998 1 11.2G <br />10/06/1998 1 49.52 <br />10/06/1998 1 15.45 <br />10/06/1998 1 7.64 <br />10/06/1998 1 1.72 <br />10/06/199�_ 1 30.67 <br />10/06/1998 10 � i0 1 <br />10/06/1998 8 1.44 <br />10/06/1998 1 15.06 <br />10/06/1998 1 53.26 <br />Total Material Cost: 195.60 <br />� /� <br />xoure cost � 9 �F •'S <br />a <br />4.00 99.60 <br />4.00 23.60 <br />Total Vehicle Cost: 123.20 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />