Laserfiche WebLink
I <br />I <br />submitted a low bid of One hundred Sixty Thousand tlinc hundred and Four <br />Col Ia.S IS160,9041 to which III euld be added desI gn and consultant <br />eanagetu•nts cost of Forty-four Thousand Dollars (S44,000). Said plans and <br />specifications for the 'Laurel Drive Restoration South Slope" Work Order 110. <br />1837 are filed In Use City Clerk's Office of the City, and are hereby <br />incorporated herein by reference. <br />j The undersigned timers '.gree Nat they will derive a benefit from the <br />reopening of Laurel Drive to vehicular traffic and wish to encourage the <br />City to award the said Laurel Drive contract to Sheldrup Construction, Inc., <br />D7 promising to pay to the City the suns hereafter stated. <br />2. Performance of York. <br />A. City shall, upon receipt of executed copies of this and other <br />agi:-ents totaling $60,000 contribution toward the construction of the <br />Laurel Drive Project, award a contract to Sheldrup Construction, Inc, for <br />construction of said project. <br />0. The project N be constructed will stabilize tht South End Slide <br />Area, as shown on Exhibit A, and will perform incidental road inprovements <br />as to reopen the road to vehicular travel. It is understood Nat there Is <br />an area north OF said area which Is noted to hive soil Instability but which <br />has not had any slides to date and Is not part of this Agreement. <br />g. Payrent, In cooslderatien of the City of Everett proceeding as <br />provided in Section 2 hereof, the undersigned Owner agrees to pay <br />$ 6656.67 toward project costs. Said-sua shall be paid either by (1) <br />2 - <br />17, <br />8909130176 voi.2263FAH t309 <br />