My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
500 LAUREL DR 2016-01-01 MF Import
>
Address Records
>
LAUREL DR
>
500
>
500 LAUREL DR 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 12:48:45 PM
Creation date
2/19/2017 1:37:04 PM
Metadata
Fields
Template:
Address Document
Street Name
LAUREL DR
Street Number
500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Creative Errgineering Options �Nc. <br />A`; m practicing in the geosciei ices <br />January 31, 2001 <br />Mr. Shawn & Ms. Kathy Hoban <br />500 Laurel Street <br />Everett, Washington 98201 <br />Dear Mr. & Ms. Hoban: <br />00-2267 <br />We are pleased to submit herewith our report entitled "Geotechnical Engineering Study, <br />Proposed Three Story Addition, 500 Laurel Drive, Everett, Washington." The primary purposes <br />of this study were to evaluate and characterize the subsurface soil and groundwater conditions in <br />the area of the proposed addition, and to develop geotechnical opinions and recommendations for <br />site earthwork operations, foundation design and slu�e stability. We proceeded with our <br />services on the basis of your November 20, 2000 written au;horization. <br />Based on observed conditions, it is our professional opinior. that it is geotEchnically feasible to <br />construct the proposed addition essentially as desired. The proposed addition may be supported <br />on conventional spread footing foundations bearing on either the thoroughly redens�ed in-place <br />medium dense shallow silty sand or , if preferred, on st least two feet of compacted structural fill <br />placed over properly redensified in-place native soil. <br />Based on our geotechnical analyses it is also our professional opinion that the sites' westem <br />perimeter slope is genera!ly stable in its current configuration under stat�c and dynamic <br />conditions. Since the siope is unlikely to be disturbed by construction sir�ce the new building will <br />be at leas•t twenty (20) feet away from the crest, we believe the slope should also be expected to <br />remain stable for the reasonable lifetime of the residence. <br />We appre�ciate the opportunity to provide this service and look fonvard to working with you <br />during the: construction phase c�f this project. Should you have any questions regarding this report, <br />please ca�ll. <br />�ery truly yours, <br />CREATIV'E ENGINEER!NG OPTIONS, INC. <br />��— <br />Gien Mann, P.E. <br />Fresident <br />gm.r�aoan Roaqenlwl Apd,�qn Ropct'e07a <br />5418 159th Place NE • Redmond, WA 98052 •(425) 883-6889 • FAX (4251867-96Cr3 • www.ceogeo.mm �; <br />
The URL can be used to link to this page
Your browser does not support the video tag.