Laserfiche WebLink
Geotechnical Engireer�ng Study Page 36 <br />00-2267 Three Story Addition - 500 Laurel Street, Everett <br />January 31, 2001 <br />rLOSURE <br />Limitations <br />The above information is being provided solely as a service to our r.lient. Under no <br />circumstances should the above information be interpreted to mean that Creative <br />�ngineering Options, Inc., is assuming any responsibility for construction site <br />safety, measuremen!s or dimensions, or the contractors, subcont�actors, or other <br />engineers activities, means or measures. Such a responsibility is not b�ing implied <br />and should not be inferred, but remains with the owner and his contractor or other <br />engineers. <br />O�r recommendations and conclusions are based on the site materials observed, <br />the limited subsurface data generated from ourfield study and geoter,hnical testing <br />proS.am, our engineering analyses, the design information provided, and our <br />experience and engineering judgement. 'fhe conclusions and recommend�tions <br />are professional opinions derived in a mannerconsistent with that level of care, skill <br />and co�npetence ordinarily exercised by other members of the profession in good <br />standing currently practicing under similar cor.ditions in this area only. No other <br />warranty, expressed or implied, is made. <br />The recommendations submitted in this report are based upon our site <br />observations and exploratory data, and our experience in the general proximity of <br />the site. These data pertain to the times and locatians where they were obtained <br />or obser�ed only, but are assun.ied to be reasonably representative of the <br />conditions beneath the majority of the area explored or observed. Soil and <br />qroundwater conditions rnay vary from those encountered. Tne nature and extent <br />of variations may not become evident until construction. Ifvariations do appear, the <br />geotechnical engineer shouid be requested to ra-evaluate the recommendations <br />of this report and to modify or verify them in writing prior to proceeding with the <br />construction. <br />Additional Services <br />Plan and Spe�ification Review: We recommend that CEO, Inc. be retained to <br />perForm a genaral review of the final d�sign plans and speci�cations. This will allow <br />5/ <br />