Laserfiche WebLink
CLOSED CM WORK ORDERS REPORT <br />City of Everett Total Utility Maintenance Management System <br />02/07/1994 Page 1 <br />Date Range :11/09/1900 - 01/29/1994 <br />CM Work Order Range :0810800810001 - 8405421080229Pattern :5201196760015 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />P-__-______________________-- <br />______________ <br />CM WORK ORDER ID: 5201196760015 Title: REPAIR 11319 IBBERSON DR <br />Item ID: -- <br />Location ID: -- <br />Program 520 Function 119 Activity 676 <br />Date Completed: 01/07/1994 <br />Overall Craft: <br />Issued: 01/07/1994 Issued by: RJW Assigned to: SKI, <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft <br />_____ <br />ID <br />______ <br />Name <br />______________________________ <br />Planned Mrs <br />Actual Mrs <br />Cost <br />WST <br />MF:C <br />MOORE, KIM C. <br />___________ <br />0.00 <br />__________ __________ <br />5.00 <br />98.65 <br />WST <br />SRJ <br />STENSETH, ROBERT J. <br />0.00 <br />8.00 <br />156.72 <br />UL <br />TDE1 <br />THOMPSON, DWAYNE E. <br />0.00 <br />3.00 <br />41.01 <br />Materials: <br />ID Description <br />Total Labor Cost: 296.38 <br />Date <br />BOX000065547 BOX METER CONC W/STEEL LID 01/11/1994 <br />COUP34004347 COUPLING 3/4" MIP X COP ELL @ 01/11/1994 <br />COUP34OC4647 COUPLING 3/4" ANG MET X FIP @ 01/11/1994 <br />COUP34141147 COUPLING 3/4" COMPRESSION CTS@ 01/11/1994 <br />METE36089447 METER 5/8" * NO REMOTE READER 01/11/1994 <br />PIPE34042847 PIPE 3/4" COPPER TUBING TYPE K 01/11/1994 <br />SETT34033647 SETTER COP 5/8" X 3/4" LGTH15" 01/11/1994 <br />0 Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />1 <br />Total Material Cost: <br />Vehicles: <br />ID Description Date Hours <br />____________ ______________________________________ ______ <br />V2117 CHEV 1 TON 191 11/10/1994 5.CO <br />V2139 SVC TRUCK CHEV 86 01/11/1994 3.00 <br />Cost <br />33.37 <br />3.50 <br />3.31 <br />6.56 <br />29.60 <br />2.50 <br />43.51 <br />122.35 <br />Cost <br />29.00 <br />15.30 <br />Total Vehicle Cost: 44.30 <br />Work Description: <br />-------------------------------------------------------------------------------- <br />MOVE SERVICE FROM CUSTOMERS' PROPERTY TO PROPERTY LINE AS HE HAS BUILT A GREEN <br />HOUSE OVER METER. <br />METER$ 11203 <br />