Laserfiche WebLink
� <br />HYDRAIILIC PROJECT <br />• �� APPROVAI, <br />�� R.C.W. iS.20.SOO DEPARTNEMTOF FISNERIES <br />�� �.C.W. 75.20.103 Cereral F�:ir.i:.iretion sldg. <br />Olyrtpin, Yashington 98504 <br />DEPIIRTNENT OF FISNERIES � March i$� 1995 (206) 753-6650 <br />(epplican[ should refer to this date in etl correspaa;erae) <br />PAGE 'J, OF � P�GES <br />Braaten, Mike <br />Unnamed Creek <br />18 CONTACT PHONE(5) <br />(:?!�6) 388-3369 <br />:ONTROL MUMBER <br />00-B6710-01 <br />ua u <br />08.0070 <br />7. The culvert shall be installed in the dry or iri isolation from the <br />stream flow by the installation of � bypass flume or culvert, or <br />by pi;mping the stream.flow around the work area. <br />8. Wastewater from pro ect activities and dewaterin shall be routed <br />to an �rea outside �he ordinary high water line �OHWL) to allow <br />removal of fine sediment and o�her contaminants prior �o being <br />discharged to state waters. <br />LOCATION: 28 West Intercity Avenue, Everett. <br />mm <br />aev ieitsiea <br />