Laserfiche WebLink
4. <br />5. <br />6. <br />7. <br />8. <br />PUBLIC WORKS PERMIT CO��MENT� <br />As per Public Works approved plan dated <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rooftop doevnspouts to the drainage system provided for this fot. <br />9. Rocftop runoff must he discharged to a roof downspout infiltration system per City of Everett <br />Storrn Manual 3-2.6.:?. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more details. <br />The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />Install erosion control measures as determined by the Public VUorks inspeclor, such as silt <br />fence, straw bales, swales, or erosien blankets. <br />Install erosion control measures per City of Everett Standards for small parcels <br />Remove erosion control measures upon completion of the project prior to fnal approval of the <br />permit. <br />All excavated material irom foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per Ci;y of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by tr,e Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must Le replaced!. <br />16 <br />17 <br />Install a Type I concrete driveway per Ci!y of Everett Standard #307. <br />Pave driveway from the front property line out to the street paving. <br />18. Con:act tfte Water District fe'r connecting provisions for this building's <br />waler and sewer services. <br />19 <br />� 20 <br />21 <br />A catch basin as per City Standard Plan �502 v✓ith a yas trap per Standard Plan #410 is <br />required for the parking area. <br />If a se�ver pump system is to be installed, the pressure line must discharge into a private <br />manhole, chen gravity fiow across the public right-of-way. <br />A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Sh,ndards 13D. <br />FrVCommerds <br />��� <br />