Laserfiche WebLink
everecc INSPEV ION REPORT <br />Address ?3a.5' <br />Contractor � ea c e 4gu—g <br />Owner <br />Date .,9 <br />TYPE OF INSPECTION REQUESTED <br />"� <br />04LDG: Pmt. No ❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No. <br />❑ PLBG: Pmt. No. <br />❑ Temp. Elect. <br />AJJ Framing ❑ Gas Piping <br />❑ Fooling <br />❑ Drywall, Nailing ❑ Consultation <br />❑ Foundation <br />❑ Shear Nailing ❑ Groundwork <br />❑ Ductwork <br />❑ Grid ❑ Struct. Slab <br />❑ Wood Stove <br />❑ Rough -in ❑ Final <br />❑ Masonry <br />❑ Service ❑ <br />❑ APPROVAL <br />❑ PARTIAL APPROVAL <br />❑ VIOLATION <br />i7CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />ALL 259.8810 FOR REINSPECTION— 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector_1. J I r ), 'l- Date r-Z-fd <br />