Laserfiche WebLink
�` <br /> BUILDING PERMIT INFORMATION <br /> ADDRESS 3�� HE�"rhC-� �hD, �✓�LETf �JBa,C.,3 <br /> (1) BUILDING PERMIT FEE g <br /> (A) PLAN CHECK FEE <br /> (2) PLUMBING <br /> (3) MECHANICAL <br /> (4) STATE SURCHARGES <br /> (A) BUILDING CODE <br /> (B) ENERGYCODE <br /> (5) DRIVEWAY PERMIT <br /> $ <br /> (6) WATER SERVICE TO BE PAID PRIOR TO BUILDING PERMIT ISSUANCE $ <br /> (A) TO BE DETCRMINED BY BLDG. INSPECTOR INCH <br /> (B) EXIST. WATER SERVICE APPLICATION NO. <br /> (7) STATUS OF SEWER CHARGES: <br /> BOND DISTRICT FOOTAGE <br /> N, S, � W <br /> ORDINANCE 1171-85 <br /> WATER <br /> SEWER <br /> TOTAL ORD. FEE <br /> SEWER CONNECTION CHARGES <br /> YEAR TRUNK $ <br /> LATERAL <br /> TOTAL CONNECTION CHARGES $ <br /> SEWER PERMIT FEE $ <br />