Laserfiche WebLink
, �� t. <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5'wide,2'deep and 25' long. See attachment for <br /> more details. <br /> / 9. ; The conlractor must meel with the Public Works Inspeclor to discuss polenlial drainage rouling prior to <br /> L� beginning ihe project. <br /> 10. � Install erosion control measures as determined by Ihe Public Works inspeclor, such as silt fence, straw <br /> bales, swales, or erosion blankets. <br /> 11. Install erosion control measures per Cily of Everelt Standards for small parcels <br /> 12. Remove erosion control measures upon complelion of the project prior to final approval of the permil. <br /> 13. All excavated material from foundalion, sidewalk and driveways shall be hauled to an approved, <br /> permitled sile. Nc wasting of material is allowed on lhis building bt. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building malerials to be stacked on sidewalks and sidewalks to be kept clean and open for <br /> pedestrian travel. <br /> 16. Adjust waler meler box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewaik as per City of Everelt Standard Plan#'s 305A& 306 on <br /> this proposal's frontage as directed by ttie Public Works Inspector(i.e. aIl unused driveways and any <br /> broken or damaged area must be repiaced). <br /> 18. Install a Type I concrete driveway per Cily of Everett Slandard #307. <br /> 19. Pave driveway from the fronl property line out to Uie street paving. <br /> 20. Contact lhe Water District for connecting provisions for lhis building's water and <br /> sewer services. <br /> 21. A catch basin as per City Standard Plan#402 willi a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 22. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, lhen <br /> gravily flow across lhe public right-oF-way. <br /> 23. A sprinkler systum is required for lhis building in compliance with the requirements o(NFDA Standards <br /> 13D. <br /> PWCommen(s //�� <br /> T <br />