Laserfiche WebLink
CIASED CM WORK ORDERS REPORT J <br /> Total Utility Maintenance Management System <br /> 08/23/1994 Page 1 <br /> ______________________________________________________________________________ <br /> Date Ranqe :08/O1/1992 - 08/17/1994 <br /> CM Work Order Range :<Blank> - 8405421080229 Pattern :7401196750958 <br /> Item Range :<Blank> - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> ===s===a=�===__�===�s___________________________ <br /> _____________________________________ <br /> CM WORK ORDER ID: 7401196750958 Title: CONVERT 358 HEATHER RD <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: WS3694G007 -- WATER SERVICE <br /> Location ID: -- <br /> Program 740 Function 119 Activity 675 <br /> Date Completed: 08/10/1994 <br /> Overall Craft: <br /> Issued: 07/21/1994 Issued by: SKL Assigned to: <br /> Out of Szrvice? NO Priority: Tra.vel Time: 0. 00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ --------------------- <br /> --------- ----------- ---------- <br /> UL NSO NIELSEN, SCOTT O. 0.00 3. 00 43 68 <br /> UL TDE1 THOMPSON, DWAYNE E. 0. 00 3. 00 43.05 <br /> Total Labor Cost: g6.73 <br /> Materials: <br /> =D ___ Description Date # Used Cost <br /> --------- ------------------'------------ <br /> -------- -------- ---------- <br /> ' ADAP34000347 ADAPTER 3/4" CST X INSTA-TITE@ OS/10/1994 2 15.02 <br /> ADAP34000547 ADAPTER 3/4" MIP X INSTA-TITE@ OS/10/1994 2 15.02 <br /> BOX000056247 BOX METER PLA 15" X 10" W/LID 08/10/1994 1 12.53 <br /> COUP34142747 COUPLING 3/4" CTS COMP X MIPT@ 08/10/1994 1 g,72 <br /> ELI,03410144{7 ELL 3/4" 90 DEG BRASS " 08/10/1994 1 1.20 <br /> METE36089447 METER 5/8" * NO REMOTE READER OS/10/1994 1 Z�,yl <br /> � VALV34008648 VALVE3METRP3/4"IL/WSFLARD COP@ 08/10/1994 2 18.76 <br /> Total Material Cost: g6.42 <br /> Vehicles: <br /> ID Description Date Hours Cost <br /> ------------ ------------------------------ / / <br /> -------- ------ ---------- <br /> V2133 SVC TRUCK CHEV 86 08 10 1994 3 .00 15.30 <br /> Total Vehicle Cost: 15 3U <br /> Total cost for work order 7401196750958: 198 45 <br />