My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7418 HEATHER WAY 2016-01-01 MF Import
>
Address Records
>
HEATHER WAY
>
7418
>
7418 HEATHER WAY 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2017 6:22:57 PM
Creation date
2/19/2017 6:22:52 PM
Metadata
Fields
Template:
Address Document
Street Name
HEATHER WAY
Street Number
7418
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> CL08ED CM WORR ORDERS REPORT <br /> Total Utility Maintenance Management System <br /> 06/24/1997 Paqe 1 � <br /> -------------_____=_________________=____==_________=____________=__ <br /> Date Range :12/03/1900 - 06/10/1997 <br /> CM Work Order Range :1001091070001 - PW2548-19- Pattern :7101236730214 <br /> Item Range :<Blank> - WVL3694L05 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> ________��_�'______________________________________________________ <br /> ----------------- -----________ <br /> CM WORK ORDER ID: 7101236730214 Title: PRIVATE 7418 HEATHER WAY <br /> «DUPLICATE PRINTING OF THIS WORK ORDER» <br /> Item ID: -- <br /> Location ID: -- <br /> Program 710 Function 123 Activity 673 <br /> Date Completed: 05/28/1997 <br /> Overall Craft: <br /> Issued: 05/13/1997 Issued by: HDA Assigned to: AGA <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Reading: <br /> Downtime: 0 hours <br /> Status: HN <br /> Labor: <br /> Craft ID Name Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> HEO AAL ARNOLD, ARTHUR L 0.00 20.00 404.60 <br /> SUP1 AGA AHLES, GREGORY A. 0. 00 4. 00 89.44 <br /> UL GDJ GOSS, DANNY JAMES 0.00 16. 00 226.08 <br /> EO MJL2 MITCHELL, JEFFREY L. 0.00 20.00 391.60 <br /> EO SDK STUART� DARRELL K. 0. 00 20.00 383.00 <br /> Total Labor Cost: 1494 72 <br /> Materials: <br /> ID Description Date # Used Cost <br /> ------------ ------------------------------ -------- -------- --------.._ <br /> BRIC00061156 BRICK CONCRETE 2" X 4" X 8" 05/21/1997 8 2. 16 <br /> CEME00061438 CEMENT 20 MIN. SET 50 LB. BAG 05/21/1997 2 23.70 <br /> COUF44300147 COUPLING 6" CONC X 6" Cl/FL 05/28/1997 1 6.35 <br /> COUP50300447 COUPLING 12" CONC X 12" Cl/PL 05/21/1997 1 15.04 <br /> PIPE44304247 PIPE 6" PVC SEWER 05/21/1997 2 2.48 <br /> PIPE50304547 PIPE 12" PVC SEWER 05/21/1997 3 14.91 <br /> Total Material Cost: b4.64 ; <br /> Vehicles: <br /> ID Description Hours Cost <br /> ------------ ------------------------------ ------ ---------- <br /> V0010 '92 GMC S10 PU 4. 00 21. 60 <br /> V2230 91 FORD F800 DLTMP 5 YARD 18. 00 194 .40 <br /> V2231 90 FORD DUMP 5-YARD 2p. 00 208.00 <br /> V3507 88 CASE BACKHOE 4X4 20.00 738.00 <br /> VS0004 '95 CHEV 1-TON 16.00 94.40 <br /> Total Vehicle Cost: 1256.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.