Laserfiche WebLink
TO <br /> FFPM <br /> d <br /> OATE <br /> SUBJICT UTY OF CVLH[TL GCLRI_lt. A:'ns111NGTO�J <br /> First floor of � <br /> Materials and Approximate cost for Youth Center 1711 Hewitt Avenue <br /> 8 500' rolls of tape �.Zp <br /> 6 Bags of bedding 2.10 <br /> Compound 12.60 <br /> 12 4 gallon cans redi-mix 37,20 <br /> 40 bags accoustical compound 151.20 <br /> 100 ' coruer beed 3.50 <br /> Plumbing fix[ures to be installed <br /> Materials needed approximatly 150.00 <br /> Panic Hardware for top floor exit doors 130.00 <br /> Linoleum for rest rooms floors 54 yards 189.00 <br /> three doors ree hung for rest rooms and <br /> utility room 18,U0 <br /> Electrical Material, wire, exit lights and etx. 900.00 <br /> Paint for rest rooms <br /> 6 gallons @8,00 per gallon 48.00 <br /> = base and tri� for doors 30.00 <br /> /��7Y•sr�' <br /> ' T��� <br /> � /,�s3.r� <br />