Laserfiche WebLink
MCCru�:;s.�� Sepa - MCCrossen Sepa <br /> BUILDING SITE WOULD BE CLEARED, and cr'ushed gravel installed for drainage <br /> f. Could erosion occur as a result of clearing, construction, or use? if so, <br /> generally describe. <br /> NO EROSION WILL ODDUR BECAUSE OF CONSTRUCTION <br /> g. About what percent of the site will be covered with impervious surfaces after <br /> project <br /> construction (for example, asphalt or buildings)? <br /> NA <br /> h. Proposed measures to reduce or control erosion, or other impacts to the earth, <br /> if any: <br /> Crushed gravel , Straw wattles, 5ilt socks and SiLT FENCE <br /> a. nir <br /> a. what types of emissions to the air would result from the proposal (i .e. , dust, <br /> automobile, <br /> odors, industrial wood smoke) during construction and when the project is <br /> completed? tf <br /> any, generally describe and give approximate quantities if known. <br /> ACTIVITIES SOURCES OF SHORT-TERM EMISSIONS AND ORDORS INCLUDE DUST GENERATED BY <br /> GRADING ACTIVITZES <br /> AND COMBUSTION EMISSIONS FROM HEAW EQUIPMENT, iT ZS ANTICIPATED THAT THESE <br /> IMPACTS <br /> WOULD BE MINIMAI � <br /> b. nre there any off-site sources of emissions or ador that may affect your <br /> proposal? if so, <br /> generally describe. <br /> NONE KNOWN <br /> c. Proposed measures to reduce or control emissions or other impacts to air, if <br /> any: <br /> CONSTRUCTION IMPACT MZTIGATION; THE WA CLEAN AIR ACR ttEQUIRES THE USE OF ALL <br /> KNOWN, AVIALIBLE <br /> AND REASONABLE MEANS OF CONTROLLING STRUCTION IMPACTS WOULD NOT BE <br /> age SlrO <br /> / <br />